What to confirm in the quote
Packaging and handling
Specify protective film, edge or thread protection, labels and any package size or weight limits. For coils, include how they will be unloaded and handled. Agree on the packing method and any special requirements in the quotation.
Material documents
Give the grade and product standard. If you need a mill test report, a specific certificate format or heat or lot traceability, request it with the inquiry. Confirm which documents can be supplied with the quoted material.
Samples and approval
For a finish sample or a trial fabricated part, state the sample size, quantity and what needs approval. Agree on sample availability, cost and timing before relying on it for an order.
Lead time and destination
Include the delivery city and country, your target date and requested delivery terms. Ask for the estimated preparation or production time and, when applicable, transit time. Confirm when the quoted lead time starts and whether it refers to dispatch or arrival.
Checks before dispatch
Tell us which checks and records you need when requesting a quote.
- Dimensions and finish
Identify critical tolerances, visible faces, finish acceptance criteria and any reference sample.
- Labels and documents
Specify any part numbers, packing-list details, inspection records or third-party inspection requirements.
- Packing and shipment
Confirm package protection, handling limits and the delivery terms agreed in the order.
Include these requirements with your inquiry
For fabricated parts, add the drawing number and revision so the inspection and packing details can be reviewed together.